Information is listed by date of posting as represented by the calendar icon. The effective date of each item will be noted in the heading or the content.
Information is listed by date of posting as represented by the calendar icon. The effective date of each item will be noted in the heading or the content.
Attached is a revised/curtailed Tustumena chain schedule commencing 5-16. The ship will go only as far as Cold Bay due to further shipyard delays. It is anticipated that Tusty will pick up the original chain schedule Cold Bay inbound on 5-19.
Attached are schedule changes for the MV LeConte on 5-29 and 6-1, to accommodate passengers attending a memorial for a longtime Tenakee resident.
Attached is a schedule change for the MV Lituya on 6-4, adding sailings to accommodate folks connecting with Alaska Airlines in order to attend Sealaska Heritage Celebration in Juneau
Attached is a schedule change for the MV LeConte on 5-18 adding a stop in Kake.
Attached is a revised schedule for the MV Tustumena, 5-24 to 5-26 adding some additional sailings.
The below schedule provides supplemental service to Haines for Beerfest on 5-25 and 5-26:
5-25 - Depart Juneau at 7:00am - Statter Harbor in Auke Bay
Arrive Haines at 10:00am - Downtown City Float
5-25 - Depart Haines at 10:30am - Downtown City Float
Arrive Juneau at 1:30pm - Statter Harbor in Auke Bay
5-26 - Depart Juneau at 10:00am - Statter Harbor in Auke Bay
Arrive Haines at 1:00pm - Downtown City Float
5-26 - Depart Haines at 1:30pm - Downtown City Float
Arrive Juneau at 4:30pm - Statter Harbor in Auke Bay
Bookings/Online Reservations close at 4:00pm the day BEFORE sailing. The three letter identifier for Goldbelt is GBT. Passengers and SMALL backpack (1 per person only), no bicycles/kayaks or other items.
Attached is a schedule change for the Aurora on 6-4, delaying her departure from Whittier to accommodate USCG Quarterly Inspection.
Attached is a schedule change for the MV LeConte/Hubbard on 5-15, adding a stop in Kake to accommodate folks traveling to Kake for High School graduation. Congratulations graduates!
Following are schedule changes for the Aurora adding Chenega Bay on 8-15 and 8-21 to accommodate folks attending the Annual Chenega Bay board meeting.
The MV LeConte will have a schedule change on 9-13 adding a stop in Pelican. Please see the attached schedule change for further information.
Due to delays in the ship yard for the MV LeConte, The MV Hubbard will be covering for the LeConte in March and April. This revised schedule can be found here. Additionally, the LeConte will be picking up for the Hubbard in May and June, and This revised schedule can be found here.
Attached is a revised LeConte schedule 5-17 to 5-31 due to Hubbard overhaul shift caused by LeConte delay Please see the attached and for Pelican for further information.